I-75 at Immokalee Rd Interchange

Project Limits: West and East of I-75 on Immokalee Rd (CR 846) 0.65 Miles

FPID No: 454099-1

The Florida Department of Transportation (FDOT) is conducting a Project Development and Environment (PD&E) Study for a potential Diverging Diamond Interchange to replace the existing diamond interchange. The approximate limits of the project are within the limited access right-of-way on either side of I-75 along Immokalee Road (CR 846). Project limits may be adjusted based on alternative.

PROJECT DOCUMENTS:

Project documents will be posted here as soon as they are available.  

Southwest Connect Logo for the I-75 South Corridor. Includes a blue highlighted I-75 shield, two flying birds, a palm tree and three diagonal lines with the lower line highlighted in blue around text that reads Southwest Connect FDOT District One Interstate Project
Work Type:   Interchange Modification
Phase:   PD&E
County:   Collier
Start of Current Phase:    2024
Estimated Completion:   09/2026

ADDITIONAL INFORMATION:

www.swflroads.com/project/454099-1

PROJECT CONTACT:

Nicole Harris, PE
I-75 Project Manager (GEC)