Southwest Connect™ I-75 Central Corridor
Central Corridor Limits: Interstate 75 from north of Bayshore Road (SR 78) to south of River Rd (SR 777)
ABOUT THE CORRIDOR:
The Southwest Connect™ Central Corridor limits extend north along I-75 from north of Bayshore Road (SR 78) in Lee County to south of the River Road (SR 777) interchange in Sarasota County, approximately 45 miles in length.
In Charlotte County, I-75 crosses the navigable Peace River between US 17 and Harbor View Road. Roadway classification within the Central Corridor limits is primarily Rural Principal Arterial – Interstate. Segments designated as Urban Principal Arterial – Interstate are within the urbanized Punta Gorda and Port Charlotte areas in Charlotte County and an area between N Toledo Blade Boulevard and Sumter Boulevard in Sarasota County. This segment of I-75 is a six-lane divided facility with a minimum right-of-way (ROW) width of 324 feet. Typically, the ROW is wider at interchanges or locations where northbound and southbound travel lanes follow separate alignments.
RELATED LINKS: I-75 NORTH CORRIDOR | I-75 SOUTH CORRIDOR | I-4 CORRIDOR

HOW CAN I PARTICIPATE?

FDOT is planning extensive public outreach, and will be announcing our meetings through mailouts, news outlets, by emails and various other media. In order to develop the best plan, we need your input. We will provide multiple avenues for ongoing public engagement to ensure the plan incorporates the needs and concerns of local communities and provides appropriate recommendations.