I-4 Corridor Master Plan Study

Project Limits: I-4 from west of SR 570 (Polk Pkwy) to west of US 27

FPID No: 442512-1

The Department is conducting a Planning and Feasibility Study from west of SR 570 (Polk Parkway) to west of US 27 in Polk County that makes up and will evaluate the future needs of the Southwest Connect™ I-4 Corridor in District One. This study will evaluate strategies for the mainline and interchanges, including managed lanes, that will improve accessibility, mobility, and safety. Results of this study will be documented in this corridor’s Master Plan.

The Planning and Feasibility study will analyze the existing and expected traffic, or demand, on the interstate system and document the findings in a Master Plan. The Plan will allow FDOT to focus future efforts and funding by prioritizing the most critical areas. This long-range approach provides a regional perspective to identify the areas where future demand is predicted and to assist in defining the Project Development and Environment (PD&E) Study limits within the I-4 corridor. Improvements identified in this Master Plan may include widening, managed lanes, modifying interchanges, and evaluating requests for new interchanges.

Southwest Connect I-4 Corridor Logo
Work Type:   Master Plan Study
Phase:   Planning
County:   Polk

ADDITIONAL INFORMATION:

www.swflroads.com/project/442512-1

PROJECT CONTACT:

Megan Goin
Project Manager

ARCHIVED PROJECT DOCUMENTS:

(These documents have been archived for reference and research purposes.)