FDOT is required to follow a federal process that uses a state of the art computer model, the Traffic Noise Model (TNM), which incorporates roadway design, traffic volumes and speeds, terrain, and other site-specific data to predict future traffic noise levels based on the proposed roadway improvements. Maximum peak hourly traffic, representing the noisiest conditions, is used in the modeling.