I-75 NORTH CORRIDOR DISTRICT ONE | SOUTHWEST CONNECT™INTERSTATE PROGRAM palm tree Abstract design of a bird flying with its wings spread out Florida Department of Transportation (FDOT) Logo

I-75 Resurfacing (River Rd (SR 777) to SR 681)

Project Limits: I-75 from River Rd (SR 777) to SR 681

FPID No: 451734-1

Area map with highlighted project limits.The purpose of this project is Resurfacing, Restoration, and Rehabilitation (RRR) of approximately 9.45 miles of I-75 (SR 93) from SR 777 to SR 681 in Sarasota County. 

Project includes milling and resurfacing the existing mainline travel lanes, milling and resurfacing the existing ramps, updating signing and pavement markings, pier protection, and replacing existing guardrail within project limits.

This project aims to address deficient pavement conditions and improve overall roadway safety and functionality.

Southwest Connect North Corridor Logo
Work Type:   Resurfacing
Phase:   Design-Build
County:   Sarasota
Length:   9.45 miles
Start of Current Phase:    Early 2025
Estimated Costs:   N/A

ADDITIONAL INFORMATION:

www.swflroads.com/project/451734-1

PROJECT CONTACT:

Megan Goin
Design Project Manager
863-519-2983

MILESTONE SCHEDULE:

A project schedule will be posted here as soon as it is available.

PROJECT DOCUMENTS:

Project documents will be posted here as soon as they are available.