I-75 Resurfacing (River Rd (SR 777) to SR 681)

Project Limits: I-75 from River Rd (SR 777) to SR 681

FPID No: 451734-1

The purpose of this project is Resurfacing, Restoration, and Rehabilitation (RRR) of approximately 9.45 miles of I-75 (SR 93) from SR 777 to SR 681 in Sarasota County. 

Project includes milling and resurfacing the existing mainline travel lanes, milling and resurfacing the existing ramps, updating signing and pavement markings, pier protection, and replacing existing guardrail within project limits.

This project aims to address deficient pavement conditions and improve overall roadway safety and functionality.

Southwest Connect Logo for the I-75 North Corridor. Includes a orange highlighted I-75 shield, two flying birds, a palm tree and three diagonal lines with the middle line highlighted in orange around text that reads Southwest Connect FDOT District One Interstate Project
Work Type:   Resurfacing
Phase:   Design-Build
County:   Sarasota
Length:   9.45 miles
Start of Current Phase:    Early 2025
Estimated Costs:   N/A

ADDITIONAL INFORMATION:

www.swflroads.com/project/451734-1

PROJECT CONTACT:

Megan Goin
Design Project Manager
863-519-2983

MILESTONE SCHEDULE:

A project schedule will be posted here as soon as it is available.

PROJECT DOCUMENTS:

Project documents will be posted here as soon as they are available.