I-75 Resurfacing (SR 681 to Fruitville Rd (SR 780)

Project Limits: I-75 from SR 681 to Fruitville Road (SR 780)

FPID No: 449188-1

Area map with highlighted project limits.The purpose of this project is to mill and resurface 9.06 miles of I-75 (SR 93) from SR 681 to SR 780 in Sarasota County. 

Project includes milling and resurfacing the existing mainline travel lanes, updating signing and pavement markings, and replacing guardrail where required within the project limits.

The project limits are subject to change based on the resurfacing limits constructed under FPID 420613-2.

This project aims to address deficient pavement conditions and improve overall roadway safety and functionality.

Southwest Connect North Corridor Logo
Work Type:   Resurfacing
Phase:   Design
County:   Sarasota
Length:   9.06 miles
Start of Current Phase:    Early 2025
Estimated Costs:   N/A

ADDITIONAL INFORMATION:

www.swflroads.com/project/449188-1

PROJECT CONTACT:

Megan Goin
Design Project Manager
863-519-2983

MILESTONE SCHEDULE:

A project schedule will be posted here as soon as it is available.

PROJECT DOCUMENTS:

Project documents will be posted here as soon as they are available.